Samuel Mustapha 9743 Orchid Breeze Ln
Sugarland, TX 77498. Telephone (713-291-6692) mustapha698@gmail.com PROFESSIONAL SUMMARY · 8years Plus of
work experience in Project controls, Planning and scheduling. · Experience
in cost engineering, cost estimating, scheduling and cost analysis/control
activities for small to medium size projects. · Experience
in Primavera Project Management P6 and Microsoft Project Management in
oil & gas and engineering company. · Experience
in managing multiple projects of different kind · Experience
in building project schedule from the start to finish. · Assisted in
writing and reviewing Proposal (RFP), award, and Selection of
Vendors/Contractors. · Years of
managing and controlling project schedule in
manufacturing and pipelines construction project. · Proficient
in schedule development, progress monitoring, reporting and forecasting,
earned value analysis (PV, EV, AC, SV, CV, CPI, SPI, TCPI), critical
path analysis and Performance Baseline Measurement. · Exceptional
interpersonal and communication skills, both written and oral, for effective
collaboration with planning, design and management · Strong
analytical skills in analyzing all aspects of the schedule, cost, and scope
and provision of adequate feedback and suggestions to the project team. TECHNICAL EXPERIENCE · Primavera
P6 7&8 version, P6 Web access, Microsoft Project,
PowerPoint, Excel, Software Development Life Cycle (SDLC); SAP
Methodology (ASAP); Spot Fire, JD Edward, and Epims. EDUCATION Degree HND/BSC. (Financial Accounting) PROFESSIONAL
EXPERIENCE Engineering Planner/Scheduler GE Oil & Gas
Houston, TexasDec 2012 to Present § Update and
maintain schedule data to ensure project consistency and optimization. § Update and
Maintained the Engineering Portion of the MIS (Master Integrated Schedule)
for Ensco, Atwood, and Trans Ocean Projects, Atwood Achiever. Follow up
with Engineering to get situation report on backlog items. § Generate
various reports as needed to every stakeholder in order to meet the
objectives and goals of company’s projects. § Work with
Project Engineers to develop Templates for BOP (Blowout Preventer) and
Sales Orders Template for Upgrade/Cross-functional Orders. § Recognize
and understand competing business requirements and make recommendations for
the overall good of the projects team. § Develop, validate and integrate
project schedules based on the defined Work Breakdown Structure. § Perform
project progress monitoring duties including identifying critical activities
and reviewing forecasts with progress achieved to date. § Meet all
established project deadlines. § Clearly
communicate roles, expectations, and accountabilities to all team members on
a regular basis. § Be a
resource to facilitate the resolution of project issues by team members.
Regularly keep Management
informed of problems, issues, and status of on-going projects. § Create and
maintain project plan. § Adhere to
all company policies, procedures, and ethics codes and ensure that they are
communicated and implemented within each project. §
Scheduling meeting with the Engineers to update the
Project schedule. Project Scheduler NOV (National
Oilwell Varco) Houston, TexasApril 2012 – Sept. 2012 § Created
and maintained projects from Oracle project into Primavera. § Developed and
maintained projects in the manufacturing of an entire Rig. § Developed WBS
(products), Activities, Resources, Roles, Relationships and steps
etc. § Held
several meetings with various group managers in the mechanical Department to
develop all the templates to meet the different types of projects existing in
the organization. § Conduct
weekly meetings to discuss the status report of the project plan if it is
within the scope. § Attend the
monthly schedulers’ meetings to acquire and understand the newly introduced
P6 8.2 web based application. § Work with
the business process engineers in the mechanical department to develop a
strategic method of operation in order to create a standard template that
works with the company’s best practice. § Initiated
the process of resource loading using the histogram analysis chart to
allocate and identify over allocation of resources. § Conduct
tests to ensure their designed safeguards and policies are effective. §
Provide oversight of the planned policies and procedures. Project Control/Scheduler Kargo Petroleum– Houston,
Texas
Sept 2010 – Feb 2012 §
Developed project management plans, risk management plans,
earned value management plans, maintained schedules, and resource
requirements. § Perform
risk evaluation, control techniques and business impact analysis to properly
plan for disasters and financially threatening circumstances. §
Develop business continuity strategies, emergency response
policies and operational §
Extensive use of Primavera 7.2 software in
performing scheduling functions. §
Ongoing liaison with various departments including
engineering, and procurement coordinating work sequences within the
integrated project plan. §
Maintained change management system identifying variances
from original scope of work. §
Resource Loaded the Schedule at Activity level and level
of effort (LOE) §
Hands- on contribution to the development and maintenance
of Work Breakdown Structure (WBS) and that lead to the establishment of a
cost/schedule baseline to move project forward. §
Involved in all the EPC phases of the schedule. §
Evaluate durations against historical or similar projects
by liaising with construction managers and superintendents to determine work
durations. §
Communicate project status report to project team and
client via weekly meetings. §
Identify critical Path Activities (CPA) and near critical
and advise project team accordingly. §
Integrating subcontract schedules with project master
schedule. §
Analyzing variances in cost and schedule performance
against Baseline. §
Established priorities, eliminate obstacles, and escalate
unresolved issue. §
Responsible for creating WBS, Activity coding and
Deliverable Activities, maintaining Logic, Status update, CPM Analysis,
Trending, and Forecasting. §
Conducted various business process improvement scenarios,
risk identification brain storming sessions, and made Co-developed and
implemented the project management plans with senior management and
subcontractors. Project control/Scheduler Bolms Solutions ConstructionJan 2008 –
July 2010 §
Create Project Master Schedules and baseline for Valve and
Vessel Projects §
Tracking the progress of the valve construction and
maintain daily status § Maintained
the construction schedule of Mounted Ball Valves, Floating Ball Valves, and
full opening check valves used by oil producing company §
Monitored actual progress, compare to baseline and report
progress against schedule in primavera P6. §
Investigated variance actual, find root cost of
unexpected cost SAP §
Conducted Project financial on weekly / monthly basses
with SAP §
Planned, developed and setup the Integrated Schedule in
Primavera P6 for Engineering Design, Procurement and Construction (EPC)
schedule for the company Project. §
Integrated the constraints of the client, schedules and
coordinated all the Drawing and Construction packages while establishing the
interfaces with all the internal and external contributors using the Critical
Path Method. §
Determined and analyzed critical path activities on
Primavera P6 for identification of potential delay impacts. §
Ensured the schedule work breakdown structure by Drawing
and Construction packages for the project scope defined by the Project
Manager and Project Team. §
Informed the Project Manager and the Project Team as soon
as possible of any significant drifts or variation in the schedule. §
Guaranteed the accuracy of the information that the
Project Manager receives and, if necessary, investigate further by checking
with the field engineers if required. §
Updated, consolidated, validated and recorded the Project
Baseline Schedule from Primavera P6 with all the parties actively involved. |
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Languages: |
Languages |
Proficiency Level |
|
English |
Advanced |
|
|
|